Salient Features

 

S. No.

Parameters
Details

1

General


Name of the Project

Jilli Chumli Khola Hydropower

Project


Name of the River

Jilli Chumli Khola


Type of Scheme

Peaking Run of River


Project Location

Mahabu Rural Municipality ,Kalikot

District, Karnali Province, Nepal


License Boundary

Easting 87°27’01" E to 87°30’00" E

Northing  27°46’56" N to 27°48’29" N





Nearest settlement

Dillikot/Baluwatar

2

Organization


Developer

Sakshyam Hydropower (P) Ltd,

Nepal


Consultant

Engineering Team of Sakshyam

Hydropower (P) Ltd.

3

Hydrology


Catchment area at intake site

50.6sq. km.


Catchment area at powerhouse

100 sq. km.


Design discharge

8.64 m3/s


Average annual discharge

2.66 m3/s


Minimum monthly discharge

0.76 m3/s


Maximum monthly discharge

7.51 m3/s


Minimum environmental release

0.16 m3/s


Flood discharge for headworks

design (100 years)

177.40 m3/s


Flood discharge for

powerhouse/tailrace design (100 years)

 

234.06 m3/s


Construction flood discharge for

headworks (20 years)

39.18 m3/s

4

Sediment Study


Average annual sediment load

171747.1 tons


Maximum sediment load

0.657 kg/m3






S. No.

Parameters

Details


Estimated annual sediment yield

0.221 million tons/year

5

Geology


Regional Geology

Higher Himalaya


Major rock types in headworks

Foliated Gneiss and thin part of

Schist


Major rock type in waterways

Gneiss and Augen gneiss, Schist and

Colluvium


Major rock type in powerhouse

Alluvial river terrace deposits, Bed

rock to thickly foliated gneiss

6

DAM


Tpye

CFRD


FSL

2935 masl


Dam crest Length

215.00 m


Lowest Riverbed Level at Weir

Axis

2893.00 masl


Foundation rock type

Foliated Gneiss with thin partings of

Schist


Dam Height

51 m


Reservoir Volume

63 MCM

7

Diversion During Construction


Construction flood (m3/s)

39.18 m3/s


Diversion type

Coffer Dam


Length (m)

500 m

8

Intake


Intake type

Side intake


Number of orifices

3


Size

2.0 m (B) x 1.5 m (H)


Top sill level

2912.00 masl


Invert sill level

29100 masl


Gate type

Fixed wheel vertical lift


Hoisting system

Gantry Crane hoist


Trash rack dimension and opening

2.0 m (W) x 1.5 m (H) x 3 (no’s)


Clear opening of trash rack

50 mm


S. No.

Parameters

Details


Trash rack cleaning mechanism

Trash rack Cleaning Machine

9

Headrace Tunnel


Type

Inverted D-shaped tunnel


Material

Concrete and shotcrete lined


Length

6500 m


Size (W x H)

2.80 m x 2.80 m


Thickness

50mm-200 mm (varies)


Support type

Concrete lining, shotcrete, steel ribs,

rock bolts

10

Adit Tunnel to HRT



Type

Inverted D-shaped tunnel


Material

Concrete and shotcrete lined


Length

500 m


Size (W x H)

2.80 m x 2.80 m

11

Surge Shaft


Type

Restricted Orifice


Diameter

4 m


Diameter of Throttled Orifice

1.0 m


Height

80.0 m


Upsurge level

2955.00 masl


Down surge level

2885 masl

12

Surface Penstock


Type

Surface Steel Pipe


Material

ASTM 537, ST-550, ST-450


Length

671.62 m


Internal diameter

1.2 m


Thickness

8 - 26 mm

13

Pressure Shaft (Horizontal and Vertical)


Type

Steel


Excavation Diameter Vertical

2.4 m


S. No.

Parameters

Details


Excavation Diameter Horizontal

(1:10) Slope

2.8 m


Internal Diameter

1.2 m


Total Length

1517.73m (Horizontal + Vertical shaft)


Vertical Shaft - I

194.35 m


Horizontal Shaft – I

440.60 m


Vertical Shaft - II

202.37 m


Horizontal Shaft – II

373.237 m


Vertical Shaft - III

173.83 m


Horizontal Shaft – III

133.35 m

14

Horizontal Shaft after Crossing


14.1

Up to Bifurcation



Horizontal Shaft IV diameter

2.80 m


Pipe diameter

1.20 m


Length

112.0 m

14.2

After Bifurcation



Bifurcation I



Pipe Diameter

0.85 m


Length

14.21 m


Bifurcation II



Pipe Diameter

0.85 m


Length

20.27 m

15

Adit Tunnel to Pressure Shaft


Type

Inverted D-shaped


Material

Shotcrete and concrete lined

15.3

Adit Tunnel -I



Length

67.88 m


Outlet Sill level

1801.38 masl


Size

2.8m x 2.8m

15.4

Adit Tunnel-II



Length

25.38 m


Size

2.8m x 2.8m


Outlet Sill level

1789.32 masl

16

Powerhouse


Type

Surface


Plan Dimensions (L x B x H)

33.5 m x 15 m x 28 m


S. No.

Parameters

Details

17

Tailrace


Type

RCC canal


Numbers

1


Size (B x H)

3.0 m x 2.3 m


Length

75 m


Outlet water level at river

1779.10 masl

18

Turbine


Type

Pelton, Vertical Axis


Number of Unit

2


Maximum Gross Head

1454 m


Minimum Gross Head

1413 m


Rated Net Head

1368 m


Rated Capacity per Unit

50500 kW


Discharge per Unit

4.32 m3/s


Turbine Axis Elevation

1480 masl


Turbine Efficiency

90.00%

19

Generator


Type of Generators

Salient Pole, Synchronous, three

phases


Number of Unit

2


Rated Output (10% overload)

55 MVA


Generation Voltage

11 kV


Frequency

50 Hz


Power Factor

0.85


Excitation System

Brushless


Speed

750 rpm


Generator Efficiency

96.5%

20

Transformer


Type

Outdoor, oil immersed


Number of Phase

3 Phase


Number of Units

2


S. No.

Parameters

Details


Frequency

50 Hz


Vector Group

YNd11


Transformer Efficiency

99%

21

Transmission Line


Transmission voltage

132 kV


Length

16 km (Phukot S/S)


Connection point

Phukot Substation

22

Power and Energy


Installed Capacity

101 MW


Gross Head (Maximum)

1454 m


Gross Head (Minimum)

1413 m


Outage

5%


Dry Season Energy (with outage)

182 GWh


Wet Season Energy (with outage)

113GWh


Total Annual Energy (with outage)

29 GWh

23

Construction Period

48 Months

24

Project Cost and Financial Indicators


Total Project Cost excluding IDC

NPR 17,342,158,329


Total Project Cost including IDC

NPR 18,344,041,357


IRR on Project

12.49 %


Equity Internal Rate of Return

(EIRR)

17.66 %


NPV (In NRs '000)

3,593,215


B/C Ratio

1.24


Discounted Payback Period

11.90years