About Project Learn More
Salient Features
|
S. No. |
Parameters |
Details |
|
|
1 |
General |
||
|
Name of the Project |
Jilli Chumli Khola Hydropower Project |
||
|
Name of the River |
Jilli Chumli Khola |
||
|
Type of Scheme |
Peaking Run of River |
||
|
Project Location |
Mahabu Rural Municipality ,Kalikot District, Karnali Province, Nepal |
||
|
License Boundary |
Easting 87°27’01" E to 87°30’00" E Northing 27°46’56" N to 27°48’29" N |
|
|
|
Nearest settlement |
Dillikot/Baluwatar |
||
|
2 |
Organization |
||
|
Developer |
Sakshyam Hydropower (P) Ltd, Nepal |
||
|
Consultant |
Engineering Team of Sakshyam Hydropower (P) Ltd. |
||
|
3 |
Hydrology |
||
|
Catchment area at intake site |
50.6sq. km. |
||
|
Catchment area at powerhouse |
100 sq. km. |
||
|
Design discharge |
8.64 m3/s |
||
|
Average annual discharge |
2.66 m3/s |
||
|
Minimum monthly discharge |
0.76 m3/s |
||
|
Maximum monthly discharge |
7.51 m3/s |
||
|
Minimum environmental release |
0.16 m3/s |
||
|
Flood discharge for headworks design (100 years) |
177.40 m3/s |
||
|
Flood discharge for powerhouse/tailrace design (100 years) |
234.06 m3/s |
||
|
Construction flood discharge for headworks (20 years) |
39.18 m3/s |
||
|
4 |
Sediment Study |
||
|
Average annual sediment load |
171747.1 tons |
||
|
Maximum sediment load |
0.657 kg/m3 |
||
|
S. No. |
Parameters |
Details |
|
Estimated annual sediment yield |
0.221 million tons/year |
|
|
5 |
Geology |
|
|
Regional Geology |
Higher Himalaya |
|
|
Major rock types in headworks |
Foliated Gneiss and thin part of Schist |
|
|
Major rock type in waterways |
Gneiss and Augen gneiss, Schist and Colluvium |
|
|
Major rock type in powerhouse |
Alluvial river terrace deposits, Bed rock to thickly foliated gneiss |
|
|
6 |
DAM |
|
|
Tpye |
CFRD |
|
|
FSL |
2935 masl |
|
|
Dam crest Length |
215.00 m |
|
|
Lowest Riverbed Level at Weir Axis |
2893.00 masl |
|
|
Foundation rock type |
Foliated Gneiss with thin partings of Schist |
|
|
Dam Height |
51 m |
|
|
Reservoir Volume |
63 MCM |
|
|
7 |
Diversion During Construction |
|
|
Construction flood (m3/s) |
39.18 m3/s |
|
|
Diversion type |
Coffer Dam |
|
|
Length (m) |
500 m |
|
|
8 |
Intake |
|
|
Intake type |
Side intake |
|
|
Number of orifices |
3 |
|
|
Size |
2.0 m (B) x 1.5 m (H) |
|
|
Top sill level |
2912.00 masl |
|
|
Invert sill level |
29100 masl |
|
|
Gate type |
Fixed wheel vertical lift |
|
|
Hoisting system |
Gantry Crane hoist |
|
|
Trash rack dimension and opening |
2.0 m (W) x 1.5 m (H) x 3 (no’s) |
|
|
Clear opening of trash rack |
50 mm |
|
S. No. |
Parameters |
Details |
|
Trash rack cleaning mechanism |
Trash rack Cleaning Machine |
|
|
9 |
Headrace Tunnel |
|
|
Type |
Inverted D-shaped tunnel |
|
|
Material |
Concrete and shotcrete lined |
|
|
Length |
6500 m |
|
|
Size (W x H) |
2.80 m x 2.80 m |
|
|
Thickness |
50mm-200 mm (varies) |
|
|
Support type |
Concrete lining, shotcrete, steel ribs, rock bolts |
|
|
10 |
Adit Tunnel to HRT |
|
|
Type |
Inverted D-shaped tunnel |
|
|
Material |
Concrete and shotcrete lined |
|
|
Length |
500 m |
|
|
Size (W x H) |
2.80 m x 2.80 m |
|
|
11 |
Surge Shaft |
|
|
Type |
Restricted Orifice |
|
|
Diameter |
4 m |
|
|
Diameter of Throttled Orifice |
1.0 m |
|
|
Height |
80.0 m |
|
|
Upsurge level |
2955.00 masl |
|
|
Down surge level |
2885 masl |
|
|
12 |
Surface Penstock |
|
|
Type |
Surface Steel Pipe |
|
|
Material |
ASTM 537, ST-550, ST-450 |
|
|
Length |
671.62 m |
|
|
Internal diameter |
1.2 m |
|
|
Thickness |
8 - 26 mm |
|
|
13 |
Pressure Shaft (Horizontal and Vertical) |
|
|
Type |
Steel |
|
|
Excavation Diameter Vertical |
2.4 m |
|
S. No. |
Parameters |
Details |
|
Excavation Diameter Horizontal (1:10) Slope |
2.8 m |
|
|
Internal Diameter |
1.2 m |
|
|
Total Length |
1517.73m (Horizontal + Vertical shaft) |
|
|
Vertical Shaft - I |
194.35 m |
|
|
Horizontal Shaft – I |
440.60 m |
|
|
Vertical Shaft - II |
202.37 m |
|
|
Horizontal Shaft – II |
373.237 m |
|
|
Vertical Shaft - III |
173.83 m |
|
|
Horizontal Shaft – III |
133.35 m |
|
|
14 |
Horizontal Shaft after Crossing |
|
|
14.1 |
Up to Bifurcation |
|
|
Horizontal Shaft IV diameter |
2.80 m |
|
|
Pipe diameter |
1.20 m |
|
|
Length |
112.0 m |
|
|
14.2 |
After Bifurcation |
|
|
Bifurcation I |
||
|
Pipe Diameter |
0.85 m |
|
|
Length |
14.21 m |
|
|
Bifurcation II |
||
|
Pipe Diameter |
0.85 m |
|
|
Length |
20.27 m |
|
|
15 |
Adit Tunnel to Pressure Shaft |
|
|
Type |
Inverted D-shaped |
|
|
Material |
Shotcrete and concrete lined |
|
|
15.3 |
Adit Tunnel -I |
|
|
Length |
67.88 m |
|
|
Outlet Sill level |
1801.38 masl |
|
|
Size |
2.8m x 2.8m |
|
|
15.4 |
Adit Tunnel-II |
|
|
Length |
25.38 m |
|
|
Size |
2.8m x 2.8m |
|
|
Outlet Sill level |
1789.32 masl |
|
|
16 |
Powerhouse |
|
|
Type |
Surface |
|
|
Plan Dimensions (L x B x H) |
33.5 m x 15 m x 28 m |
|
S. No. |
Parameters |
Details |
|
17 |
Tailrace |
|
|
Type |
RCC canal |
|
|
Numbers |
1 |
|
|
Size (B x H) |
3.0 m x 2.3 m |
|
|
Length |
75 m |
|
|
Outlet water level at river |
1779.10 masl |
|
|
18 |
Turbine |
|
|
Type |
Pelton, Vertical Axis |
|
|
Number of Unit |
2 |
|
|
Maximum Gross Head |
1454 m |
|
|
Minimum Gross Head |
1413 m |
|
|
Rated Net Head |
1368 m |
|
|
Rated Capacity per Unit |
50500 kW |
|
|
Discharge per Unit |
4.32 m3/s |
|
|
Turbine Axis Elevation |
1480 masl |
|
|
Turbine Efficiency |
90.00% |
|
|
19 |
Generator |
|
|
Type of Generators |
Salient Pole, Synchronous, three phases |
|
|
Number of Unit |
2 |
|
|
Rated Output (10% overload) |
55 MVA |
|
|
Generation Voltage |
11 kV |
|
|
Frequency |
50 Hz |
|
|
Power Factor |
0.85 |
|
|
Excitation System |
Brushless |
|
|
Speed |
750 rpm |
|
|
Generator Efficiency |
96.5% |
|
|
20 |
Transformer |
|
|
Type |
Outdoor, oil immersed |
|
|
Number of Phase |
3 Phase |
|
|
Number of Units |
2 |
|
S. No. |
Parameters |
Details |
|
Frequency |
50 Hz |
|
|
Vector Group |
YNd11 |
|
|
Transformer Efficiency |
99% |
|
|
21 |
Transmission Line |
|
|
Transmission voltage |
132 kV |
|
|
Length |
16 km (Phukot S/S) |
|
|
Connection point |
Phukot Substation |
|
|
22 |
Power and Energy |
|
|
Installed Capacity |
101 MW |
|
|
Gross Head (Maximum) |
1454 m |
|
|
Gross Head (Minimum) |
1413 m |
|
|
Outage |
5% |
|
|
Dry Season Energy (with outage) |
182 GWh |
|
|
Wet Season Energy (with outage) |
113GWh |
|
|
Total Annual Energy (with outage) |
29 GWh |
|
|
23 |
Construction Period |
48 Months |
|
24 |
Project Cost and Financial Indicators |
|
|
Total Project Cost excluding IDC |
NPR 17,342,158,329 |
|
|
Total Project Cost including IDC |
NPR 18,344,041,357 |
|
|
IRR on Project |
12.49 % |
|
|
Equity Internal Rate of Return (EIRR) |
17.66 % |
|
|
NPV (In NRs '000) |
3,593,215 |
|
|
B/C Ratio |
1.24 |
|
|
Discounted Payback Period |
11.90years |